Space Options
Multi-Tenant: YES
1U-22U, 1/2 Cabinet, Full Cabinets
The Buidling
The Andover space currently occupies 80,000 in Andover, Massachusetts. The datacenter offers complete cloud to colocation solutions in secure facility audited under HIPAA, PCI DSS, SOC 1 Type II and SOC 2 Type II standards annually. The Andover location falls into a Tier Three (3) standard from a power and cooling standpoint and are in an N+1 configuration as required. SLA covers network availability at 99.995%, which matches the Tier Four (4) criterion.
Andover Datacenter Specifications
This location proviudes Tower and Multi-Tenant Solutions, including full cabinets
- Cooling system design to support dense environments
- Self managed temperature and humidity monitoring
- Dual-interlock, dry-pipe pre-action fire suppression system with VESDA
- Four (4) pad mounted 1,500 KVA service transformers (upgradeable)
- Switchable commercial power feed from national grid substation
- Five (5) 1,400 horsepower Caterpillar 1000 kw backup generators in an N+1 configuration
- Eight (8) GE 500 kVA UPS inverters and battery packs in a 2N configuration
- Generators tested weekly at no load and monthly at full site load
- Minimum of 24 hours of on-site fuel storage
- AT&T
- Comcast
- Lightower
- Sidera Networks
- Verizon
- Veroxity
- Axcelx
- 24x7x365 onsite personnel
- Two factor authentication including the use of Biometric scanning device before allowing entry into the data center and critical areas
- ITAR, EU-US Privacy, SOC 1, SOC 2, HIPAA, GLBA, and PCI Colo*
- Security Mantrap
- Video surveillance and capture to DVR