Loading .....
Colocating in Boston has never been easier.
Space Options

Multi-Tenant: YES

1U-22U, 1/2 Cabinet, Full Cabinets

The Buidling

The Andover space currently occupies 80,000 in Andover, Massachusetts. The datacenter offers complete cloud to colocation solutions in secure facility audited under HIPAA, PCI DSS, SOC 1 Type II and SOC 2 Type II standards annually. The Andover location falls into a Tier Three (3) standard from a power and cooling standpoint and are in an N+1 configuration as required. SLA covers network availability at 99.995%, which matches the Tier Four (4) criterion.

Andover Datacenter Specifications

    This location proviudes Tower and Multi-Tenant Solutions, including full cabinets
  • Cooling system design to support dense environments
  • Self managed temperature and humidity monitoring
  • Dual-interlock, dry-pipe pre-action fire suppression system with VESDA
  • Four (4) pad mounted 1,500 KVA service transformers (upgradeable)
  • Switchable commercial power feed from national grid substation
  • Five (5) 1,400 horsepower Caterpillar 1000 kw backup generators in an N+1 configuration
  • Eight (8) GE 500 kVA UPS inverters and battery packs in a 2N configuration
  • Generators tested weekly at no load and monthly at full site load
  • Minimum of 24 hours of on-site fuel storage
  • AT&T
  • Comcast
  • Lightower
  • Sidera Networks
  • Verizon
  • Veroxity
  • Axcelx
  • 24x7x365 onsite personnel
  • Two factor authentication including the use of Biometric scanning device before allowing entry into the data center and critical areas
  • ITAR, EU-US Privacy, SOC 1, SOC 2, HIPAA, GLBA, and PCI Colo*
  • Security Mantrap
  • Video surveillance and capture to DVR
  • TV, Coutch, Work Areas